SolarEdge C&I BESS CSS-OD 107: Expandable up to 2.1MWh with Less Than 20ms Backup Switching
Single cabinet with 107kWh capacity, expandable up to 2.1MWh per project
SolarEdge has further disclosed product details of its new-generation commercial and industrial (C&I) energy storage system, CSS-OD 107. From a system design perspective, CSS-OD 107 adopts modular architecture. Each basic system configuration includes one 107kWh battery cabinet combined with a 29.9kW or 49.9kW battery inverter.
Users can select different power configurations based on project load requirements, PV installation size, electricity pricing structures, and backup power needs, while gradually expanding system capacity by adding additional battery cabinets.
According to SolarEdge, the CSS-OD 107 can be deployed starting from a single 107kWh battery cabinet, with a maximum project expansion capacity of 2.1MWh. The system supports both indoor and outdoor installation and is primarily designed for small- and medium-sized commercial and industrial users, including factories, warehouses, commercial buildings, hotels, agricultural facilities, and small industrial parks.
Unlike large-scale grid-side energy storage projects, these users typically do not require tens of MWh of storage capacity from the beginning. Instead, they focus more on whether the storage system can match their existing PV capacity, electricity consumption patterns, and investment budgets.
Companies can initially install a smaller-scale system and expand capacity later based on actual operating performance and future energy needs. This approach can reduce upfront investment pressure while keeping flexibility for future expansion.

First integrated backup reserve capability, switching time below 20 milliseconds
When looking only at capacity, the CSS-OD 107 does not represent a major increase compared with SolarEdge's previous-generation 102.4kWh product. However, the key improvement is not the battery capacity itself, but rather the upgrade in overall system functionality.
Compared with the previous CSS-OD 102.4, one of the most important upgrades of CSS-OD 107 is that backup reserve capability has been integrated into the battery inverter. SolarEdge states that CSS-OD 107 is its first C&I energy storage system featuring integrated backup reserve capability. When the grid experiences a failure or power outage, the system can switch into backup operation mode and continue supplying power to critical loads, with a switching time of less than 20 milliseconds.
For ordinary commercial users, a power outage may only temporarily affect lighting and office equipment. However, for factory control systems, data equipment, cold-chain warehouses, communication infrastructure, and certain continuous production processes, even short interruptions can cause equipment shutdowns, data loss, or product damage. Therefore, C&I customers' demand for energy storage is gradually expanding from the initial goal of increasing PV self-consumption and reducing electricity costs toward improving power continuity and energy resilience.
However, it should be noted that CSS-OD 107 currently only provides backup reserve capability. According to SolarEdge's plan, the actual backup function will be activated through a firmware update expected to be released in 2026. Therefore, it should not be assumed that all installed CSS-OD 107 systems can immediately operate in off-grid backup mode.
More than just a battery cabinet: Integrated management of PV, storage, and loads
Beyond hardware improvements, CSS-OD 107 will also connect with SolarEdge's ONE for C&I energy management platform. The platform can analyze various project parameters, including PV generation, commercial load profiles, electricity prices, feed-in tariffs, and weather conditions, to optimize charging and discharging strategies for the energy storage system.
If a project operates in markets with time-of-use tariffs or dynamic electricity pricing, the system can adjust charging and discharging schedules according to price fluctuations, further improving project economics. This also reflects SolarEdge's product strategy. The company is not simply selling a battery cabinet, but rather building an integrated ecosystem that combines PV inverters, energy storage systems, power plant controllers, and energy management software. SolarEdge aims to manage the entire energy flow — from solar generation and battery charging/discharging to commercial load management — within its own ecosystem.

Factory pre-assembly reduces on-site installation complexity
For C&I energy storage projects, installation and delivery efficiency are as important as equipment cost and project economics. The CSS-OD 107 is pre-assembled and tested at the factory. Once transported to the project site, installers mainly need to complete equipment positioning, electrical connections, and commissioning.
This reduces on-site construction work and lowers the risk of installation errors. SolarEdge Designer, the company's design tool, can also provide recommendations for storage sizing and project economic analysis based on PV capacity, electricity consumption profiles, and other site parameters.
For installers and EPC companies, completing system design, equipment installation, commissioning, and later operation and maintenance within a unified product and software ecosystem can help shorten project delivery cycles.
Final Thoughts
In addition to the newly introduced 107kWh CSS-OD 107, SolarEdge currently offers other C&I energy storage products, including 102.4kWh and 197kWh solutions. Among them, the CSS-OD 197 provides a single-cabinet capacity of 197kWh, with a maximum project expansion capacity of 4MWh, making it more suitable for larger commercial and industrial applications.
Through different capacity configurations, SolarEdge is expanding its product portfolio from small commercial projects to larger industrial energy storage applications. This also reflects a clear trend emerging in Europe's C&I energy storage market. Competition among companies is no longer limited to battery capacity, cycle life, and equipment pricing. Instead, the focus is increasingly shifting toward the integration of:
- Solar PV systems
- Energy storage
- Energy management platforms
- Dynamic electricity pricing
- Backup power capabilities
Companies that can integrate these functions into a more efficient and unified solution will have greater opportunities to capture customers. For SolarEdge, the significance of CSS-OD 107 is not simply the addition of another 107kWh battery cabinet. More importantly, it represents another step in completing the company's product portfolio in the European C&I solar-plus-storage market and further supports SolarEdge's transformation from a traditional PV inverter supplier into a comprehensive energy solution provider.
Data Sheet⬇️:





Featured News
All News →
Italy Opens 16GWh Storage Auction Today as Second MACSE Round Expands by 60%
Italy will open its second MACSE energy storage auction on 24 November, procuring up to 16GWh of capacity from new projects scheduled for delivery in 2029. Compared with the first auction, procurement volume has increased by 60%, while the maximum permitted bid has been reduced from €37,000/MWh/year to €27,000/MWh/year. The results will provide a new indication of competition, regional deployment and current cost levels in Italy's energy storage market.

The Real Test Comes When the Grid Goes Down: 1,000 Witness MWh-Scale Diesel–Battery Microgrid Demonstration
A live MWh-scale demonstration at Sungrow GEPS 2026 showcased how battery storage, diesel generation and grid-forming technology can work together to deliver reliable power in off-grid applications. ENERGY PLANET joined the event to explore the technical highlights and their implications for future C&I energy storage projects.

Tesla Launches 7.4MW Powercore: Connecting Batteries Directly to the 34.5kV Grid and Medium Voltage to 800V Data Centres
Tesla has launched Powercore, a solid-state medium-voltage platform integrating transformer, bidirectional inverter and circuit-breaker functions. Rated at 7.4MW, it connects 800V–2,000V DC systems with 10kV–34.5kV AC networks, targeting battery storage, solar and 800V AI data centres. The first units are scheduled to operate in 2027, although Tesla has not disclosed pricing, customers or initial projects.

UPS Moves to the Grid Edge as Vertiv Launches 3 MVA Medium-Voltage System
Vertiv has launched the 3 MVA PowerNexus MV UPS, moving UPS functionality from the indoor low-voltage side to the outdoor 34.5kV grid connection point. Designed for new and expanding AI data centres, the system integrates fault ride-through, AI load smoothing, power-quality control and one-to-four-hour battery backup. Following a proof-of-concept demonstration in Bologna, commercial shipments are expected to begin in mid-2027.

Envision Gen 8 Selected for 442 MWh Grid Forming BESS in Germany Taking Partnership Close to 600 MWh
Envision Energy and German storage developer ju:niz Energy are advancing the 442 MWh Smareg 13 project in Bavaria. The four-hour, grid-forming development is planned next to the operational Smareg 12 site, while public records currently show a 100 MW/401 MWh configuration and a March 2028 target date.

CATL Delivers First 8-Hour EnerQB Systems for Quinbrook's 24GWh Australian Pipeline
CATL and Quinbrook Infrastructure Partners have completed production and delivery of the first EnerQB long-duration energy storage systems. Designed for eight-hour discharge, the initial units will undergo a 12-month trial at Stanwell Power Station in Queensland, Australia. Quinbrook has identified a potential 3GW/24GWh project pipeline, although wider deployment will depend on trial results, financing, grid connections and subsequent procurement.

1.24GWh! Sungrow Supplies Europe's Largest Operational Energy Storage Project
BW ESS’s Hams Hall project in the UK has officially brought its first phase online, with 350MW/1.243GWh of capacity, making it the largest operational battery storage project in Europe. Sungrow supplied the BESS, with Energy-IO and other partners involved in project delivery. The project also secured a 10-year optimisation agreement with EDF, debt financing from international banks and equity investment from AIP, highlighting the full value chain behind Europe’s GWh-scale storage projects, from equipment supply and project delivery to commercial operations and financing.

BNEF's Q4 Energy Storage Tier 1 List Shrinks 26% to 50 Manufacturers
BloombergNEF has named 50 manufacturers to its Q4 2026 Tier 1 Energy Storage list. Based on publicly available company disclosures, Energy Planet has confirmed 19 of the manufacturers and compiled historical inclusion records for 12 of them. While a single appearance shows that a supplier met the criteria for that quarter, repeat inclusion offers a stronger indication of its ability to maintain a pipeline of qualifying projects. Tier 1 remains a measure of market adoption, however, rather than a product-quality ranking, corporate credit rating or substitute for project-level technical and financial due diligence.