LONGi Montalto Solar-BESS Project

Project Overview
The LONGi Montalto Solar-BESS Project is a 13.75 MW / 50.16 MWh integrated solar-plus-storage project located in Montalto, Italy. Co-located with an existing 35 MWp photovoltaic plant near the Mediterranean coast, the project represents LONGi’s first fully integrated BESS deployment in Europe. The system was successfully grid-connected and entered operation in April 2026, demonstrating LONGi’s end-to-end solar and energy storage integration capability in the European market. Source: https://www.longi.com/en/news/europe-storage/
The LONGi Montalto Solar-BESS Project is a 13.75 MW / 50.16 MWh integrated solar-plus-storage project located in Montalto, Italy. Co-located with an existing 35 MWp photovoltaic plant near the Mediterranean coast, the project represents LONGi’s first fully integrated BESS deployment in Europe. The system was successfully grid-connected and entered operation...
Contact the Company
Interested in this project?
Send a message to learn more about this project.

The Future of Clean Energy Starts Here
Explore innovative solutions in solar & energy storage.
